Pipeline
- Gemini Midstream - Enable to Carthage        - Install 47,520’ of 36" .625 Included 8,000' of HDD
 
- Energy Transfer - XTO Midkiff- Install 47,520’ of 12” Steel Pipeline (Executed concurrently with XTO Pegaus)
 
- Energy Transfer - XTO Pegasus- Install 95,040’ of 12” Steel Pipeline (Executed concurrently with XTO Midkiff)
 
- Medallion - Upton to Epic 20"- 50,869’ of 20” .500 WT included over 2,000’ of HDD bores
 
- Medallion – Martin Loop North & South- 84,480’of 16” .500 WT – Project executed in (3) phases
- Included 12,500’ through Midland, TX. HDD for Loop 250, Business 20/Railroad, and I-20.
 
 
     
 
    
        
		     PIPELINE
- Axiall – HDPE Brine Line- Install 43,000’ of 24” HDPE DR9. Included a 3,248’ HDD Road Bore
 
- Kinder Morgan – Reineke co2 Pipeline- Install 79,200’  of 20” Steel Pipeline
 
- Pioneer – O’Daniels Water Line- Install 126,720’ of 30” HDPE DR11
 
- XTO Global Projects - Goldenchild- Install multiple 20", 16", 12", 8" and 4" pipelines
 
- XTO Global Projects - PLU 21- Install multiple 20", 16", 12", 8" and 4" pipelines
 
 
        
            
        
     
 
    
        
           
        
 	    
		     Pipeline
- Kinder Morgan – ETC & DCP Laterals- Install 27,446’ of 20” Steel and 2,700’ of 16” Steel
 
- Canyon/James Lake Midstream – Goldsmith Pipeline- Install 102,000’ of 12” Steel Pipeline
 
- Medallion – Ward Trunkline- Install 89,760’ of 16” Steel Pipeline
 
- Crossing Rocks Energy – Avary Waterline- Install 63,360’ of 12” HDPE DR11
 
- Woodland Midstream- Install 68,640’ of 12”  Steel Pipeline
 
 
     
 
    
        
		     Facility
- Plains – Casselman to Goldsmith Reversal- Completed civil, structural, mechanical, and electrical work for 10” reversal construction project
 
- Enable – Clear Lake Facility RTO Install- Fabricated and installed 8”-20” above ground fabrication, civil and structural work, installed and set RTO unit.
 
- Enterprise – Fairway to Genoa Junction- Installed bi-directional turbine meter run, pig receiver, associated civil, and E&I work.
 
- Anadarko – Multi Train SWD Facilities- Turnkey construction of multiple multi-train SWD facilities in the Permian Basin.
 
 
        
           
        
     
 
    
        
        
 	    
		     Facility
- Simplex/Grinnell – EnLink Midstream Fire Suppressant System- Installed 8,700’ of 24” SDR9 HDPE and various lateral lines within a 7 cryo-plant facility. Completed foundation work and installation of main pump house and 6 valve houses 
 
- Regency – Amine Treating Facility- Installation and pipe design for temporary amine treating facility within an existing compressor station in the Permian basin. Installation and design of a liquid measurement facility.
 
- DCP Midstream – Rocky Rhoades Booster Station- Installation of grassroots facility consisting of (2) 7044 Wakesha compressors and associated equipment in Granbury, TX.
 
 
     
 
    
        
		     Facility
- Centerpoint Energy - Clearlake Plant Train #2    - Set and installed (6) 3516 compressor packages, header racks, and associated piping
 
- Centerpoint Energy – Two Acre Separator Lot    - Set horizontal slug catcher and installed associated 24” piping and valves.
 
- Centerpoint Energy – Cason Separator Lot    - Set Horizontal slug catcher and installed associated 24” piping, valves, control loops, and meter runs
 
- Centerpoint Energy – Sabine Separator Lot    - Set horizontal slug catcher and associated 16” piping and valves
 
 
        
        
     
 
    
        
        
 	    
		     Facility
- Centerpoint Energy – Misc. Booster Stations    - Set and installed multiple 3516 compressor packages at miscellaneous booster stations in East Texas and West Louisiana.
 
- Energy Transfer – Separator Facility    - Build separator facility for existing 36” and 42” natural gas pipelines. Fabricated and installed 36” header system and piping reroutes to meter station.
 
- XTO Global Projects - PLU2 Frac Pond- Fabricate and install IPC piping and associated equipment for the PLU2 frac pond project.
 
- XTO Global Projects - Poker Lake Unit 26 CVB- Build hybrid tankless separation facility.
 
- XTP Global Projects - Poker Lake Unit 16 CVB- Build hybrid tankless separation facility.